Construction
Cleanup
(New & Remodel)
Wherever Construction, wherever construction is taking place, there will be a big mess left in its wake that somebody has to clean up. They are almost always in a bind to meet the deadline for cleanup and turn over. Never worry though Superior Facility Service Group can be that somebody you rely on.
We at Superior Facility Service Group take pride in our reputation of being on schedule and on time making the property satisfactory to sell, or if it's presold, making it turn-key ready for the new owner/tenant; it will shine.
Our Post Construction/ Remodeling Cleaning Service includes the following:
Basic new structure or remodel cleaning is a given and can be addressed in two ways, depending on the site's needs. It can be contracted to be done all at one time, or in steps as the site progresses. Here's a simple example of a three-step cleaning for commercial construction cleanup proposal:
Step One - "Rough Clean"
A step one cleaning may be requested by the GC after the framing, plumbing, and electrical have been inspected and completed. This may be done before or after the sheetrock has been installed, or what is also considered the "dried in stage". Step one cleaning will entail of the removal of large debris and trash, stickers will be removed from windows, and the unit will be swept out. This will help prepare for the arrival of incoming subs for painting, flooring, fixtures, and cabinetry.
Step Two - "Prep Clean"
A step two cleaning will be requested prior to the GC's inspection, leading to the final "punch list" for all contractors. It will consist of a detailed cleaning of the entire space, including restrooms. Step two Includes removal of any stickers remaining on the appliances, fixtures, cabinets, and windows. Cleaning baseboards, light fixtures, doorframes, interior windows, window ledges, mirrors, and floors vacuumed and/or mopped, as needed, to prepare for the punch list.
Important note: At this point of the construction process, various contractors may still be returning to the unit to address concerns. Step two should be scheduled after their concerns have been addressed. Step two cleaning items requested after step two cleaning has been completed and approved will be provided at an additional charge.
Step Three - "Final Clean"
A step three cleaning during a post-construction clean will be requested after the GC's inspections have taken place and subs entry to the site has ceased. All touch-ups will be focused on, and everything will be considered a new owner or tenant ready. This step will complete with the floors being swept and mopped, carpet vacuumed, and any dust still remaining addressed. When the conclusion of this step is approved, the site cleaning effort for this unit will be considered complete.